Neighborhood Ultility Permits Point
Datathon 2025
Updated Oct 17, 2026
About this dataset
<span><strong>This map is related to HB – 143 § 33.2-280.2 (Effective January 1, 2025) Utility work database which stipulates The Virginia Department of Transportation map any permits issued to utility companies for work in a residential neighborhood . </strong></span><span><p><i><strong>§ 33.2-280.2. (Effective January 1, 2025) Utility work database.</strong></i></p><p><i><strong>A. As used in this section:</strong></i></p><p><i><strong>"Service connection" means any utility facility installed overhead or underground between a distribution main, pipelines, conduits, lines, wires, or other sources of supply and the premises of the individual customer.</strong></i></p><p><i><strong>"Utility work" means the construction, installation, removal, or substantial maintenance of a privately, publicly, or cooperatively owned line, facility, or system for producing, transmitting, or distributing telecommunications, cable television, electricity, gas, oil, petroleum products, water, steam, storm water not connected with highway drainage, or any other similar commodity, including any fire or police signal system. "Utility work" does not include emergency maintenance or repairs or any work directly related to any individual service connection or service drop.</strong></i></p><p><i><strong>B. The Department shall establish and maintain a publicly accessible database and map of all utility work that has been approved by the Department and will occur within a highway right-of-way in a residential neighborhood, as specified by the utility. Such database shall include the location where such work will occur, the start date of such work, the projected end date of such work, the company administering such work, and any other relevant information; however, under no circumstances shall such database and map provide information on any (i) utility work within a right-of-way not maintained by the Department; (ii) critical utility infrastructure, as designated by the utility, that, upon disclosure, has the potential to jeopardize security or critical services, including Critical Energy Infrastructure Information and Controlled Unclassified Information; or (iii) information the permittee has designated as confidential. Such information shall be available in the database at least seven days prior to the start date of any such utility work and shall be deleted from such database 90 days after the completion of such work.</strong></i></p></span>
Data and resources (11)
- HTML
ArcGIS Hub Dataset
Modified Jul 17, 2026
- ArcGIS
ArcGIS GeoService
Modified Jul 17, 2026Map preview available
- CSV
CSV
Modified Oct 17, 2026Table and Data API available
- ZIP
Shapefile
Modified Jul 17, 2026Map preview available
- GeoJSON
GeoJSON
Modified Jul 17, 2026Map preview available
- KML
KML
Modified Jul 17, 2026Map preview available
- ZIP
File Geodatabase
Modified Jul 17, 2026
- TXT
Feature Collection
Modified Jul 17, 2026
- XLSX
Excel
Modified Oct 17, 2026Table and Data API available
- GPKG
GeoPackage
Modified Jul 17, 2026
- GDB
SQLite Geodatabase
Modified Jul 17, 2026